|
Towers and Wireless Facilities - What Communities Should Control |
PDF |
| Print | |
- Cost of Expert Assistance - Can be required to be paid for by Applicant (No Cost to Community)
- No towers on 'Speculation', i.e. without a service provider who can prove the need for the facility
- Verification/Determination of actual need (How do you know that the Tower or Wireless Facility is really needed? You would probably be surprised at how many times there is no provable need.)
- Location (You can prioritize preferred locations . . . without violating the prohibition against 'zoning them out')
- Height (Does it really have to be as tall as the service provider says ? Almost never!)
- Visibility
- Required Co-location of facilities (to minimize the number of towers)
- Number of Sites in the Community
- Application Fees - Amount
- Non-tax Revenue (Different than Fees)
- Verification of compliance with the FCC’s RF Emission Standards
- Aesthetics/Appearance (It doesn't have to be recognizable as a wireless facility)
- Lighting can be prohibited
- Setback
- Signage
- Screening
- Structural Adequacy and Integrity
- Site Security
- Utilities (Underground versus Aerial)
- Removal Bond (In the event the facility is ever abandoned)
- Indemnification for use of municipally-owned property
- Insurance
- Interference with other communications & electronic devices
- Inspection to assure that what is constructed is what was permitted
|